PROJECT INFORMATION
Address: Waste treatment plant, Dong Hoi city, Quang Binh province
Item: Installation of solar power system, capacity 1000KW
OVERVIEW
The project includes Roof structure survey and Load Diagram analysis to design the optimal system;
Selecting equipment using high-efficiency Mono-perc panels and advanced string inverters;
Implementing the construction and installation of anti-corrosion support frames and safe installation of solar panels, ensuring the ability to withstand storms;
Connecting to the grid according to technical standards;
Installing an online monitoring system to track power output, detect errors and optimize the continuous performance of the system.
PROJECT CONCEPT
Green Energy for Recycling: Reducing Carbon Emissions. The project aims to build a large capacity solar power system (1MW) to provide clean, on-site electricity for the Waste Treatment Plant, significantly reducing operating electricity costs and demonstrating social responsibility and environmental protection through reducing CO2 emissions.
SIMILAR PROJECTS
"Smart and Energy Efficient M&E Solution", aims to build a comprehensive, high-quality M&E system, integrating advanced technology to ensure stable, safe and cost-optimized operation for PREMO's electronic components factory.
Details
"Industry 4.0 Standard and Sustainable M&E System", focuses on providing a high-quality, flexible, scalable M&E system that meets the strict technical standards of the specialized materials manufacturing industry, while complying with sustainable development orientations.
Details
"Enhancing Factory Power Efficiency and Safety", with the goal of optimizing energy efficiency (reducing power loss) and enhancing the stability and safety of power sources, a vital factor for large-capacity beer production lines.
Details