PROJECT INFORMATION

Address: Phu Bai Industrial Park - Thua Thien Hue
Items: Installation of lighting system, Renovation and upgrading of power system

Chia sẻ:

OVERVIEW

The main work includes Auditing and Upgrading the Main Power System, focusing on replacing/renovating low-voltage electrical cabinets and especially adding/upgrading the reactive power compensation system (Capacitor Bank) to achieve optimal $cosphi$ and avoid electricity fines;

Checking and replacing old, damaged power cables for large-capacity equipment such as boilers and filling machines;

Implementing a comprehensive conversion of the Lighting System to energy-saving industrial LED lights that are moisture-proof and dust-proof, helping to improve the working environment and significantly reduce operating costs.

PROJECT CONCEPT

Improve Factory Power Supply Efficiency and Safety. The goal is to optimize energy efficiency and increase the stability and safety of the power supply, which is a key factor for a large-capacity beer production line.

SIMILAR PROJECTS

PREMO VIETNAM FACTORY PROJECT
PREMO VIETNAM FACTORY PROJECT

"Smart and Energy Efficient M&E Solution", aims to build a comprehensive, high-quality M&E system, integrating advanced technology to ensure stable, safe and cost-optimized operation for PREMO's electronic components factory.

Details
RELATS VIETNAM FACTORY PROJECT
RELATS VIETNAM FACTORY PROJECT

"Industry 4.0 Standard and Sustainable M&E System", focuses on providing a high-quality, flexible, scalable M&E system that meets the strict technical standards of the specialized materials manufacturing industry, while complying with sustainable development orientations.

Details
HEINEKEN DANANG BREWERY
HEINEKEN DANANG BREWERY

"Modernization of Medium Voltage Power Infrastructure and Smart Lighting", aims to enhance the safety and reliability of medium voltage power distribution systems by upgrading RMU (Ring Main Unit) cabinets, while optimizing electricity costs for lighting.

Details